Select your language

Project at Sichelweg

3d visualisation with lexocad
Project Gruner Böhringer
The 3D visualisation of the planning of the tunnel in Binningen BL was created with the module "2DR strasse" and "lexocad". For this purpose, the surrounding area was recorded with a drone and merged with the project, which was planned by the company Gruner Böhringer.
Image
Further information on the project
Project information
Sichelweg project, Bottmingen 
Client: EBM Netz AG 
Construction management: Gruner Böhringer AG 
Microtunnelling: Braumann Tiefbau AG 
Civil engineering: Marti AG Basel 
Visualisation: cadwork informatik Basel 
Length of tunnel: 530 metres 
Inner diameter: 1.6 metres 
Height difference: 65 metres 
Gradient: 8% and 15% 
Depth: approx. 8 metres